Back to Results
First PageMeta Content
Technology / Waste / Economic geology / Energy conversion / Chemical engineering / Bottom ash / Fly ash / Thermal power station / Stormwater / Energy / Coal / Environment


Asheville Steam Electric Generating Plant – Coal Ash Excavation Plan
Add to Reading List

Document Date: 2014-11-13 08:23:16


Open Document

File Size: 872,20 KB

Share Result on Facebook

City

Arden / Asheville / /

Company

Duke Energy / /

Event

FDA Phase / Natural Disaster / Reorganization / /

Facility

Asheville Steam Electric Generating Plant / Plant Buncombe County / Ash Basin Dam / Superior Court / Asheville Plant / Steam Electric Generating Plant / The Plant / General Facility Description The Plant / Asheville Regional Airport / /

IndustryTerm

gas and oil combustion turbines / taxiway infrastructure / permit applications / flue gas desulfurization / /

NaturalFeature

French Broad River / /

Organization

United States Environmental Protection Agency / Rim Ditch System Commission / Division of Water Resources / North Carolina Department of Environment and Natural Resources / Asheville Plant’s Unit / North Carolina Department of Environment / Superior Court / /

Person

Ash Basin / Rim Ditch / /

Position

utilizing current contractor / head / Engineer / /

Product

Plan / /

ProvinceOrState

Asheville Steam Electric Generating Plant Buncombe County / North Carolina / Pollutant Discharge Elimination System Permit No. #NC0000396 Buncombe County / /

Technology

wastewater treatment / Wastewater Treatment system / /

SocialTag