Back to Results
First PageMeta Content
Visual arts / Design / Construction management / Architects / Occupations / Design–build / Design–bid–build / Project delivery method / Construction bidding / Building engineering / Architecture / Construction


INTRODUCTION This Edition of the Manual for Planning and Execution of State Permanent Improvement Projects, Part II, has been revised to more closely reflect 2008 statutory changes regarding project delivery methods for
Add to Reading List

Document Date: 2011-06-01 13:26:00


Open Document

File Size: 17,09 KB

Share Result on Facebook

IndustryTerm

design-build-finance-operate-maintain / /

OperatingSystem

OSE / /

Position

Construction Manager / manager agents / Manager at Risk / contractor / /

SocialTag