Toggle navigation
PDFSEARCH.IO
Document Search Engine - browse more than 18 million documents
Sign up
Sign in
Back to Results
First Page
Meta Content
View Document Preview and Link
INTRODUCTION This Edition of the Manual for Planning and Execution of State Permanent Improvement Projects, Part II, has been revised to more closely reflect 2008 statutory changes regarding project delivery methods for
Add to Reading List
Document Date: 2011-06-01 13:26:00
Open Document
File Size: 17,09 KB
Share Result on Facebook
IndustryTerm
design-build-finance-operate-maintain /
/
OperatingSystem
OSE /
/
Position
Construction Manager /
manager agents /
Manager at Risk /
contractor /
/
SocialTag
Visual arts
Design
Construction management
Architects
Occupations
Design–build
Design–bid–build
Project delivery method
Construction bidding
Building engineering