<--- Back to Details
First PageDocument Content
Land transport / Tunnel boring machine / Tunnel / Earth pressure balance / Mott /  Hay and Anderson / Kaimai Tunnel / Tunnels / Transport / Construction
Date: 2005-08-11 00:07:10
Land transport
Tunnel boring machine
Tunnel
Earth pressure balance
Mott
Hay and Anderson
Kaimai Tunnel
Tunnels
Transport
Construction

CB[removed]) LegCo Panel on Environmental Affairs and LegCo Panel on Transport Meeting 24 January 2002 Protection of Wetlands in Long Valley in Light of the Latest Development of the Spur Line Project

Add to Reading List

Source URL: www.legco.gov.hk

Download Document from Source Website

File Size: 211,47 KB

Share Document on Facebook

Similar Documents

Spring Statement March 2018 First Spring Statement heralds the ‘light at the end of the tunnel’ Chancellor Philip Hammond has presented his first Spring Statement, with something of a

Spring Statement March 2018 First Spring Statement heralds the ‘light at the end of the tunnel’ Chancellor Philip Hammond has presented his first Spring Statement, with something of a

DocID: 1vsax - View Document

Localized phase structures growing out of quantum fluctuations in a quench of tunnel-coupled atomic condensates Clemens Neuenhahn,1, ∗ Anatoli Polkovnikov,2 and Florian Marquardt1 1  We investigate the relative phase b

Localized phase structures growing out of quantum fluctuations in a quench of tunnel-coupled atomic condensates Clemens Neuenhahn,1, ∗ Anatoli Polkovnikov,2 and Florian Marquardt1 1 We investigate the relative phase b

DocID: 1vp7E - View Document

Folia Linguistica Historica 2017; 38: 29–73  Teresa Fanego* The trolley rumbled through the tunnel: On the history of the English Intransitive

Folia Linguistica Historica 2017; 38: 29–73 Teresa Fanego* The trolley rumbled through the tunnel: On the history of the English Intransitive

DocID: 1voA7 - View Document

Le tunnel : Les préparatifs pour la construction du tunnel entre Hochelaga et Longueuil se continuent

Le tunnel : Les préparatifs pour la construction du tunnel entre Hochelaga et Longueuil se continuent

DocID: 1votd - View Document

I DIVIETI PERMANENTI DI CIRCOLAZIONE Zona Île-de-France  Tunnel dell’autostrada A14 sotto La Défense:

I DIVIETI PERMANENTI DI CIRCOLAZIONE Zona Île-de-France Tunnel dell’autostrada A14 sotto La Défense:

DocID: 1vo2D - View Document