Back to Results
First PageMeta Content
Earth / Environmental engineering / Hydraulic engineering / Environmental soil science / Irrigation / Storm drain / Stormwater / Pipe / Surface runoff / Water / Environment / Water pollution


MARION COUNTY DEPARTMENT OF PUBLIC WORKS ENGINEERING STANDARDS The Marion County Board of Commissioners Adopted These Standards on April 11, 1990
Add to Reading List

Document Date: 2015-01-28 13:35:31


Open Document

File Size: 459,51 KB

Share Result on Facebook

Company

Commissioners Adopted / Advanced Design Systems Inc. / /

Event

Natural Disaster / /

IndustryTerm

energy loss / energy dissipators / bank slopes / bank / rubber gasket joints / underground utilities / /

NaturalFeature

Inlets inlet / Catch Basins inlet / Minor creeks / /

Organization

Department of Public Works / Central Intelligence Agency / Oregon Department of Transportation Publication / Public Works Board of Commissioners / Soil Conservation Service / Public Works Department / /

Person

Robert J. Hansen / Willis G. Worcester / Randall Franke Garry Kunz Garry / Garry Kunz Garry Heer V / Deanna Peck / Harold Todd / /

/

Position

Civil Engineer / Engineer Technician / Major / Director of Public Works / hydraulic head / county engineer / Office Specialist / Secretary / Acting Engineering Manager / Director / /

ProvinceOrState

Marion County / /

SocialTag