<--- Back to Details
First PageDocument Content
Electronic engineering / Computing / Engineering / Electronic design automation / Microprocessors / Central processing unit / Digital electronics / Electronic design / Adder / Propagation delay / Standard cell / Static timing analysis
Date: 2016-04-03 10:58:13
Electronic engineering
Computing
Engineering
Electronic design automation
Microprocessors
Central processing unit
Digital electronics
Electronic design
Adder
Propagation delay
Standard cell
Static timing analysis

Proc. Asia South Pacific Design Automation Conf. (ASP-DAC), Shanghai, China, vol. 1, Jan. 2005, pp. I/2-I/7. Opportunities and Challenges for Better Than Worst-Case Design Todd Austin, Valeria Bertacco, David Blaauw, an

Add to Reading List

Source URL: web.eecs.umich.edu

Download Document from Source Website

File Size: 462,52 KB

Share Document on Facebook

Similar Documents

Pow  Standard Specifications Type: MS3706 MS3700 Slim-shaped Plug-in Pressure/Load Cell Converter with Isolated Single/Dual Output

Pow Standard Specifications Type: MS3706 MS3700 Slim-shaped Plug-in Pressure/Load Cell Converter with Isolated Single/Dual Output

DocID: 1vaJH - View Document

Accelerator	
  Fundamentals	
  Homework	
  6	
   1.   We	
  have	
  our	
  standard	
  FODO	
  cell	
   β max  β min

Accelerator  Fundamentals  Homework  6   1.   We  have  our  standard  FODO  cell   β max β min

DocID: 1v8Yo - View Document

TN702-Adaptation-of-standard-instruments-to-reproduce-specific-process-conditions-development-of-a-high-temperature-fixed-bed-calorimetric-cell

TN702-Adaptation-of-standard-instruments-to-reproduce-specific-process-conditions-development-of-a-high-temperature-fixed-bed-calorimetric-cell

DocID: 1toxr - View Document

Housing Complaints Cell Standard Operating Procedures (SOPs) for Grievance Redressal/ Complaints Handling at ERRA A. General Complaints S.No. 1.

Housing Complaints Cell Standard Operating Procedures (SOPs) for Grievance Redressal/ Complaints Handling at ERRA A. General Complaints S.No. 1.

DocID: 1sJDd - View Document

Housing Complaints Cell Standard Operating Procedures (SOPs) for Grievance Redressal/ Complaints Handling at ERRA A. General Complaints S.No. 1.

Housing Complaints Cell Standard Operating Procedures (SOPs) for Grievance Redressal/ Complaints Handling at ERRA A. General Complaints S.No. 1.

DocID: 1sjB9 - View Document