Back to Results
First PageMeta Content



Work Description: P14/13 Holt, Flynn, Melba Path Repairs Projected completion date: April 2015 Defect Id Defect Location Suburb Remove existing 75-100mm and replace with 100mm concrete footpath square metre Remove existi
Add to Reading List

Document Date: 2015-02-09 22:36:00


Open Document

File Size: 259,50 KB

Share Result on Facebook

Company

Grainger / /

Currency

pence / /

Facility

centre HOLT / dock HOLT / square Remove / /

Person

Melba Path Repairs Projected / /