Pumping station / Electric power transmission / Energy / Electromagnetism / Electric power / Electrical substation


The Facilities approved by this ROD include the following primary water and power conveyance facilities: • Main and Lateral Pipelines – approximately 263 miles of buried water pipelines, between 16 and 84 inches in d