Back to Results
First PageMeta Content
Transportation in the United States / Interstate Highway System / Transportation in Minnesota / I-35W Mississippi River bridge / General contractor / Minnesota State Highway 23 / Design–build / Minnesota Department of Transportation / Interstate 35E / Interstate 35 / Minnesota / Construction


Locked Incentive Date (LID) Evaluation Report
Add to Reading List

Document Date: 2014-03-19 12:54:57


Open Document

File Size: 1,48 MB

Share Result on Facebook

City

North St Paul / Washington / Minneapolis / Hermantown / North St / /

Company

Mn/DOT / DeSoto / ICI / /

Currency

USD / /

Event

Company Expansion / Funding / Product Issues / /

Facility

DeSoto Bridge / Gateway Trail / Gateway Trail tunnel / University of Minnesota / Mississippi River bridge / I-35W Bridge / /

IndustryTerm

bridge anti-icing systems / i.e. contractor / transportation link / media attention / /

NaturalFeature

Big Detroit Lake / Mississippi River / Detroit Lakes / /

Organization

Mn/DOT office of Construction / Mn/DOT office of Construction and Innovative Contracting / Minnesota Department of Transportation / Minnesota Attorney General’s Office / North St. Paul High School / Innovative Contracting / Mn/DOT’s office of Construction / Minnesota Department of Natural Resources / University of Minnesota / /

Person

Roosevelt / /

Position

contractor / Evaluation Report EXECUTIVE / EXECUTIVE / motivating contractor / /

Product

Harman On Time Radio / Locked Incentive Date (LID) / bituminous paving / utility relocation / concrete / material removal / /

ProvinceOrState

North St Paul District / Minnesota / Mississippi / I-35W District / Florida / /

SocialTag