<--- Back to Details
First PageDocument Content
Technology / Spacecraft / Satellites / Astrometry / Perturbation / Orbit / United States Space Surveillance Network / Global Positioning System / International Astronautical Congress / Astrology / Celestial mechanics / Astrodynamics
Date: 2011-11-04 10:08:17
Technology
Spacecraft
Satellites
Astrometry
Perturbation
Orbit
United States Space Surveillance Network
Global Positioning System
International Astronautical Congress
Astrology
Celestial mechanics
Astrodynamics

62nd International Astronautical Congress, Cape Town, SA. Copyright ©2011 by the International Astronautical Federation. All rights reserved. IAC-11-B5.2.9 USING THE DSST SEMI-ANALYTICAL ORBIT PROPAGATOR PACKAGE VIA TH

Add to Reading List

Source URL: swfound.org

Download Document from Source Website

File Size: 853,33 KB

Share Document on Facebook

Similar Documents

Media Kit 2018 Fintechnews Network Fintechnews Universe Websites are planets, subsites and social media are satellites

Media Kit 2018 Fintechnews Network Fintechnews Universe Websites are planets, subsites and social media are satellites

DocID: 1xTJi - View Document

APRS Link Budgets for Psat, BRICsat and USS Mission Uplinks: Uplink and downlink missions for APRS are unbalanced. The minimum APRS mission for all satellites is to receive at least one mobile or handheld user transmi

DocID: 1vj5P - View Document

Reporting Methods The GOES DCS system design had several factors. First is to be able to perform reliable two-way communication between unmanned small stations and synchronous satellites. The basics of that technology

DocID: 1va71 - View Document

Optical acquisition module 6 Hz ÷ 15 MHz OAM305 TESEO plug-in systems and remote satellites are fiber optic communication links for the

Optical acquisition module 6 Hz ÷ 15 MHz OAM305 TESEO plug-in systems and remote satellites are fiber optic communication links for the

DocID: 1v9IA - View Document

REVOLUTIONIZING SATELLITE MANUFACTURING THROUGH PLUG AND PLAY PROBLEM:SATELLITE COSTS ERODE PROFITS AND LIMITS THE SERVICES “ (satellites) lead times used to be 36 months,” said Jean-Loïc Galle, CEO of Thales Aleni

REVOLUTIONIZING SATELLITE MANUFACTURING THROUGH PLUG AND PLAY PROBLEM:SATELLITE COSTS ERODE PROFITS AND LIMITS THE SERVICES “ (satellites) lead times used to be 36 months,” said Jean-Loïc Galle, CEO of Thales Aleni

DocID: 1uQPW - View Document