Back to Results
First PageMeta Content
Wire rope / Bridges / Forth Road Bridge / Mechanical engineering / Suspension bridge / John A. Roebling / Electrical wiring / Eastern span replacement of the San Francisco – Oakland Bay Bridge / Knob and tube wiring / Wire / Cables / Construction


Forth Road Bridge – First internal inspection, strength evaluation, acoustic monitoring and dehumidification of the main cables Barry R. Colford
Add to Reading List

Document Date: 2011-11-30 10:33:56


Open Document

File Size: 365,17 KB

Share Result on Facebook

City

West Lothian / Teeside / London / New York / /

Company

Weidlinger Associates Inc. / C Spencer Ltd. / John A Roebling’s Sons Company / Andrew / /

Continent

Europe / /

Country

United States / United Kingdom / Scotland / /

Facility

UK bridge / Forth Rail Bridge / A bridge / Forth Road Bridge / /

IndustryTerm

road network / strand adjustment equipment / steel platforms / galvanized steel / chemical / paint / bridge contractors / steel / transport network / /

Organization

Institution of Civil Engineers / /

Person

Barry R. Colford Depute / Faber Maunsell / Forth Estuary / Charles P. E. Cocksedge / /

Position

CONTRACTOR / U.S. contractor / General Manager / Major / Technical Director / representative / consultant / Engineer / /

SocialTag