<--- Back to Details
First PageDocument Content
Sewerage / Sanitation / Water pollution / Aerated lagoon / Sewage treatment / Civil engineering / MWH Global / Pollution / Environment / Environmental engineering
Date: 2013-07-31 17:43:31
Sewerage
Sanitation
Water pollution
Aerated lagoon
Sewage treatment
Civil engineering
MWH Global
Pollution
Environment
Environmental engineering

Wastewater treatment plant timeline    The following timeline captures the key dates in the design, construction and operation of the  wastewater treatment plant since July 2001.     

Add to Reading List

Source URL: www.wanganui.govt.nz

Download Document from Source Website

File Size: 80,36 KB

Share Document on Facebook

Similar Documents