<--- Back to Details
First PageDocument Content
Washington State Route 520 / Montlake /  Seattle / Washington State Department of Transportation / Governor Albert D. Rosellini Bridge—Evergreen Point / Washington Park Arboretum / Portage Bay / High-occupancy vehicle lane / Interstate 5 in Washington / Montlake Cut / Washington / Seattle metropolitan area / Transport
Date: 2014-11-26 16:41:50
Washington State Route 520
Montlake
Seattle
Washington State Department of Transportation
Governor Albert D. Rosellini Bridge—Evergreen Point
Washington Park Arboretum
Portage Bay
High-occupancy vehicle lane
Interstate 5 in Washington
Montlake Cut
Washington
Seattle metropolitan area
Transport

How will we connect the new SR 520 bridges? Construction will take place in the following phases: Step 1 - Floating bridge::RUNRQWKHQHZÀRDWLQJEULGJHLVDOUHDG\XQGHUZD\RQ/DNH:DVKLQJWRQ New floating bridge - u

Add to Reading List

Source URL: www.wsdot.wa.gov

Download Document from Source Website

File Size: 1,25 MB

Share Document on Facebook

Similar Documents

SR 520 Bridge Replacement and HOV Program June Closures Graphic

SR 520 Bridge Replacement and HOV Program June Closures Graphic

DocID: 1g7hV - View Document

WASHINGTON STATE TRANSPORTATION COMMISSION Regular Meeting Summary March 17 & 18, 2015 Chairman Haley opened the meeting with a moment of silence for Joe Arrants, who died last week in working on the SR 520 floating brid

WASHINGTON STATE TRANSPORTATION COMMISSION Regular Meeting Summary March 17 & 18, 2015 Chairman Haley opened the meeting with a moment of silence for Joe Arrants, who died last week in working on the SR 520 floating brid

DocID: 196on - View Document

WASHINGTON STATE TRANSPORTATION COMMISSION Regular Meeting Summary January 21 & 22, 2015 Chairman Haley opened the meeting at 9:00 a.m. ROAD USAGE CHARGE ASSESSMENT: REPORT ON MODELING OF URBAN AND RURAL EQUITY AND FINAN

WASHINGTON STATE TRANSPORTATION COMMISSION Regular Meeting Summary January 21 & 22, 2015 Chairman Haley opened the meeting at 9:00 a.m. ROAD USAGE CHARGE ASSESSMENT: REPORT ON MODELING OF URBAN AND RURAL EQUITY AND FINAN

DocID: 196lc - View Document

Complete Compete Preserve MaintainReflections and

Complete Compete Preserve MaintainReflections and

DocID: 18CYi - View Document

Seattle Department of Transportation Scott Kubly, Directorhttp://www.seattle.gov/transportation/  Department Overview

Seattle Department of Transportation Scott Kubly, Directorhttp://www.seattle.gov/transportation/ Department Overview

DocID: 1441f - View Document