<--- Back to Details
First PageDocument Content
Electronic toll collection / U.S. Route 50 / Pricing / Transport economics / Bay Area Toll Authority / San Francisco – Oakland Bay Bridge / Antioch Bridge / FasTrak / Golden Gate Bridge / California / Transportation in the San Francisco Bay Area / San Francisco Bay
Date: 2009-11-03 13:39:42
Electronic toll collection
U.S. Route 50
Pricing
Transport economics
Bay Area Toll Authority
San Francisco – Oakland Bay Bridge
Antioch Bridge
FasTrak
Golden Gate Bridge
California
Transportation in the San Francisco Bay Area
San Francisco Bay

3 REASONS BATA MUST RAISE TOLLS • Seismic Retrofits Needed for Dumbarton and Antioch Bridges (estimated cost: $750 million) • Financial Market Upheaval Has Raised Borrowing Costs (approximately $35 million more each

Add to Reading List

Source URL: www.mtc.ca.gov

Download Document from Source Website

File Size: 2,28 MB

Share Document on Facebook

Similar Documents

Page 1 of 2 LWVBA VOTER September 2005 Joyce Roy, Editor  *

Page 1 of 2 LWVBA VOTER September 2005 Joyce Roy, Editor *

DocID: 1qcEy - View Document

Page 1 of 2 LWVBA VOTER September 2005 Joyce Roy, Editor  *

Page 1 of 2 LWVBA VOTER September 2005 Joyce Roy, Editor *

DocID: 1q0a2 - View Document

Oakland Heyday Lunch Bucket Paradise: A True-Life Novel Setterberg, Fred256 pages

Oakland Heyday Lunch Bucket Paradise: A True-Life Novel Setterberg, Fred256 pages

DocID: 1p3Pw - View Document

VOTER SEPTEMBER, 2008 IN THIS ISSUE * LWVBA STANDS ON NOVEMBER BALLOT MEASURES * REQUEST FOR REGIONAL MEETING MONITORS * UPCOMING LWVBA DATES

VOTER SEPTEMBER, 2008 IN THIS ISSUE * LWVBA STANDS ON NOVEMBER BALLOT MEASURES * REQUEST FOR REGIONAL MEETING MONITORS * UPCOMING LWVBA DATES

DocID: 1oEJK - View Document

San Francisco-Oakland Bay Bridge Toll Plaza  Metering Lights  Peak period messages

San Francisco-Oakland Bay Bridge Toll Plaza Metering Lights Peak period messages

DocID: 1l4aP - View Document