Architecture / Structural system / Precast concrete / Reuse / Earthquake engineering / Structural failure / Column / Rebar / Concrete slab / Concrete / Construction / Civil engineering


INVESTIGATION OF THE FEBRUARY 14, 2011 PARTIAL COLLAPSE OF A PARKING STRUCTURE UNDER CONSTRUCTION IN SAN ANTONIO, TX U. S. Department of Labor Occupational Safety and Health Administration
Add to Reading List

Document Date: 2013-06-10 19:10:59


Open Document

File Size: 4,02 MB

Share Result on Facebook

City

Washington / DC / SAN ANTONIO / /

Company

Grout Tech Inc. / Precast Erectors Inc. / Urban Concrete Contractors Ltd. / Consulting Engineers Group Inc. / Garza/Bomberger & Associates / BE LIMITED / S-C-R Inc. / Rehler Vaughn & Koone Inc. / /

Currency

USD / /

Event

FDA Phase / /

Facility

DURING PLACEMENT OF CONCRETE IN THE CIP PIER / University Health System / University Health System West Parking Garage / Pier Connections From / West Parking Garage / CIP pier / /

IndustryTerm

crane services / incident site / metal coupling / /

Organization

office of Engineering Services Directorate / Initial / Occupational Safety and Health Administration Directorate of Construction / San Antonio Area Office / OSHA’s National Office in Washington / U. S. Department of Labor / Occupational Safety and Health Administration / /

Person

Mohammad Ayub / S.E. Scott Jin / /

Position

precast concrete designer / Regional Administrator for Region / precast designer / Construction Manager and General Contractor / general contractor / General / engineer / /

Product

Consolidated Crane / F15 / Job Use / /