Back to Results
First PageMeta Content
Land transport / Toll road / Toll / Autotoll / Tseung Kwan O Tunnel / Electronic toll collection / Road transport / Transport


For discussion on 7 April 2006 FCR[removed]ITEM FOR FINANCE COMMITTEE
Add to Reading List

Document Date: 2006-10-06 05:14:18


Open Document

File Size: 23,26 KB

Share Result on Facebook

Company

Autotoll Company Limited. / Detailed Design 3 3 Tendering 3 Equipment Manufacturing / Electrical / Mechanical Services / /

Currency

USD / /

Event

Person Communication and Meetings / /

Facility

Lion Rock Tunnel / Tseung Kwan O Tunnel / /

IndustryTerm

toll collection equipment / toll field equipment / traffic control equipment / ancillary toll collection field equipment / vehicle detection equipment / toll booth equipment / equipment manufacturing / field equipment / vehicle classification equipment / consultancy services / real-time monitoring / toll lane processors / toll lane equipment / project management / communication networks / real-time equipment status / toll computer systems / toll collection systems / /

Movie

Page 3 4 / /

Organization

Environment / Transport and Works Bureau / Electrical and Mechanical Services Trading Fund / /

Person

Shing Mun Tunnels / /

Position

CAPITAL WORKS RESERVE FUND HEAD / supervisor / collector / Secretary / Director / supervisor control console / Commissioner / /

Technology

toll lane processors / /

SocialTag