Back to Results
First PageMeta Content
Architecture / Soil science / Geotechnical engineering / Culvert / Riprap / Dam / Concrete / Erosion / Construction / Environmental soil science / Building materials


Appendix B BAER Treatments Sample Contract Specifications Storm Inspection Response Work Statement Storm inspection/response keeps culvert and drainage structures functional by cleaning sediment and debris from the inle
Add to Reading List

Document Date: 2013-03-24 12:16:50


Open Document

File Size: 279,23 KB

Share Result on Facebook

Company

Rock Buttress-Streambank / Embankment-Streambank / Streambank Armoring Work Statement Streambank / 220 Appendix B 622(11) Rental / /

Facility

Special Rock Embankment / /

IndustryTerm

hauling and spreading equipment / metal gates / overflow device / mulch blower equipment / specified equipment / hand tools / metal pipe risers / steel pipe / travel way / metal pipe risers inlets / heavy equipment / temporary traffic control devices / corrugated metal pipe risers / sign systems / hand equipment / metal-end-sections / steel grate cover / low water stream crossing site / erosion control products / steel grate covers / /

NaturalFeature

Low-Water Stream Crossings Work Statement Low-water stream / /

Organization

Basket Assembly / Storm Patrol Unit / /

Position

driver / contractor / General / engineer / /

Product

Patrol / /

Technology

cellular telephone / CMP / /

SocialTag