Soil science / Water pollution / Geotechnical engineering / Environmental issues / Land management / Erosion / Surface runoff / Soil / Environmental impact assessment / Environment / Earth / Environmental soil science


The Use of Vetiver Grass System for Erosion Control and Slope Stabilization along the Yadana Gas Pipeline Right of Way The Yadana Gas Pipeline Project The Petroleum Authority of Thailand Bangkok, Thailand
Add to Reading List

Document Date: 2004-04-18 01:39:14


Open Document

File Size: 68,22 KB

Share Result on Facebook

Country

Thailand / Myanmar / /

Event

Natural Disaster / Environmental Issue / /

Facility

Ratchaburi Power Plant / Slope Complex / pipeline R/W / Pipeline Inspection Gauge / /

IndustryTerm

natural gas procurement / electronic device / nearest archaeological and historical site / overall gas transmission facilities / crude oil equivalent / i.e. oil / erosion control device / energy consumption / indigenous energy sources / on-line information / natural gas / surface drainage control device / oil / mass transportation system / On-line pipeline integrity monitoring software / local transportation / gas delivery point / food sources / gas pipeline route / gas pipeline / steel / gas pipeline system / /

Movie

Right of Way / /

NaturalFeature

Khwae Noi River / Mae Klong River / /

Organization

ON ALTERNATIVE / Operations Center / Operation and Maintenance Center / National Environment Board / Electricity Generating Authority of Thailand / Petroleum Authority of Thailand / Pricing Reconciliation Subcommittee / Department of Highways / Petroleum Authority of Thailand Bangkok / Forestry Patrol Unit / American Society of Mechanical Engineers / /

Person

Ban I Tong / Mae Rim / /

Position

Contractor / Governor / /

ProvinceOrState

Kanchanaburi / Ratchaburi / Buri / Thong Pha Phum / /

PublishedMedium

Archaeology / /

Region

western Thailand / /

Technology

X-ray / /

SocialTag