Back to Results
First PageMeta Content
Transport / Construction / Abutment / Bridges / Pier


TEE PIER NOTES: THE TEE PIERS SHOWN IN THESE PLANS ARE DESIGNED FOR USE WITH THE H24-06 EXAMPLES OF BRIDGE SEAT AND STEP CALCULATIONS: PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE STANDARDS. THE PIER MAY
Add to Reading List

Document Date: 2014-08-29 14:38:05


Open Document

File Size: 119,35 KB

Share Result on Facebook

Facility

OR PIER / PIER MAY BE USED FOR EITHER GRADE SEPARATION / PIER BRG / P.I. STATION / ABUTMENT NO. / PIER BRGS / BRIDGE SHALL HAVE ONE ON EITHER PIER / ONE FIXED PIER AND ONE EXPANSION PIER / ONLY DISTINCTION STATION / BRIDGE STATION / WHERE H IS THE OVERALL HEIGHT OF PIER / ABUTMENT BRGS / PIER NO. / Highway Division STANDARD DESIGN / BRIDGE STA. / SHOWN ARE THE SAME FOR EITHER FIXED OR EXPANSION PIER / /

Organization

PRIMARY ICE FORCE / /

/

Position

GENERAL INFORMATION H24-02-06 / DESIGNER / ENGINEER / /

ProvinceOrState

Saskatchewan / /

SocialTag