Back to Results
First PageMeta Content
Particle accelerators / Beamline / KEK / EPICS / Quadrupole magnet / Magnet / Dipole magnet / Quadrupole / Power supply / Physics / Electromagnetism / Magnetism


3 PF-AR 3-1 Operation Summary The KEK B factory (KEKB), which shares the beam transport (BT) line with PF-AR, was shut down on June 30, 2010 and the upgrade toward the Super KEKB will continue until FY2014. At the same t
Add to Reading List

Document Date: 2012-02-26 20:01:45


Open Document

File Size: 225,21 KB

Share Result on Facebook
UPDATE