Toggle navigation
PDFSEARCH.IO
Document Search Engine - browse more than 18 million documents
Sign up
Sign in
Back to Results
First Page
Meta Content
View Document Preview and Link
3 PF-AR 3-1 Operation Summary The KEK B factory (KEKB), which shares the beam transport (BT) line with PF-AR, was shut down on June 30, 2010 and the upgrade toward the Super KEKB will continue until FY2014. At the same t
Add to Reading List
Document Date: 2012-02-26 20:01:45
Open Document
File Size: 225,21 KB
Share Result on Facebook
UPDATE