Berm

Results: 352



#Item
71Signal processing filter / Berm / Electronic filter / Windrow / Photographic filter / Technology / Electromagnetism / Snow removal / Geotechnical engineering / Fortification

Construct "J-hook" at each end on an individual section of sock or berm. Filter Material

Add to Reading List

Source URL: www.iowadot.gov

Language: English - Date: 2013-09-03 11:18:42
72Mining / Berm / Occupational safety and health / Haulage / Rail transport

Fatality #15 - November 7, 2013 Powered Haulage – Georgia – Crushed, Broken Granite Vulcan Construction Materials, L.P. - Lithia Springs Quarry METAL/NONMETAL MINE FATALITY - On November 7, 2013, a 46-year old equipm

Add to Reading List

Source URL: www.msha.gov

Language: English - Date: 2014-07-24 09:55:57
73Snow removal / Mining / Geotechnical engineering / Berm / Fortification

DEPARTMENT OF MINES, MINERALS AND ENERGY GENERAL PERMIT FOR SAND AND GRAVEL OPERATIONS LESS THAN TEN ACRES IN SIZE GENERAL TERMS AND CONDITIONS This general permit governs the mining of sand, or sand and gravel which aff

Add to Reading List

Source URL: www.dmme.virginia.gov

Language: English - Date: 2007-04-06 11:22:39
74Radnor Township /  Delaware County /  Pennsylvania / Pennsylvania / Delaware Valley / Interstate 476 / Lehigh Valley

SOUND BARRIER VOTING RESULTS FOR THE RESIDENTIAL SIDE MAY 9, 2013 Northbound I-476 Morris Rd. to Earthen Berm

Add to Reading List

Source URL: www.paturnpike.com

Language: English - Date: 2014-05-15 08:59:15
75Geology / Underground mining / Stoping / Berm

MNM Fatal[removed]     

Add to Reading List

Source URL: www.msha.gov

Language: English - Date: 2014-07-24 09:56:02
76Abutment / Bridges / Berm / Erosion / Earth / Environment / Geotechnical engineering / Environmental soil science / Agriculture

SUBDRAIN NOTES: SEE H30SI[removed]AND "GENERAL ELEVATION DATA" SHEETS FOR DETAILS OF PLACING FACE OF ABUTMENT ALL SUBDRAINS AND SUBDRAIN OUTLETS REQUIRED FOR THIS STRUCTURE.

Add to Reading List

Source URL: www.iowadot.gov

Language: English - Date: 2014-03-04 11:58:39
77Berm / Construction / Geotechnical engineering / Abutment / Bridges

FACE OF ABUTMENT SUBDRAIN NOTES: FOOTING

Add to Reading List

Source URL: www.iowadot.gov

Language: English - Date: 2013-09-03 11:10:37
78Berm / Construction / Geotechnical engineering / Abutment / Bridges

FACE OF ABUTMENT SUBDRAIN NOTES: FOOTING

Add to Reading List

Source URL: www.iowadot.gov

Language: English - Date: 2014-03-04 11:58:39
79Spokane /  Washington / Spokane Valley /  Washington / Washington State Route 290 / Washington / Geography of the United States / Construction / Snow removal / Snowplow / Berm

SNOW PLOWING PRIORITIES Plowing and deicing procedures for Spokane Valley areas follow these priorities: Crews will conduct limited plowing/deicing

Add to Reading List

Source URL: www.spokanevalley.org

Language: English - Date: 2013-11-07 11:31:01
80

Berm Slope - 2:1 (nominal) Diversion Types 1, 2, and 3 may be used interchangably unless otherwise specified in the contract documents. Alternate configurations may be used upon

Add to Reading List

Source URL: www.iowadot.gov

- Date: 2013-09-03 11:18:45
    UPDATE