<--- Back to Details
First PageDocument Content
Date: 2011-09-02 00:08:44

GENERAL NOTES FOR FACILITATORS: 1. PRIOR TO WORKSHOP: 1A) Receive and check the shipment – a skid, shrink-wrapped, 61 marked boxes – 20 Tool kits, 20 Lifter-Workshop kits, 20 Challenge kits (assuming 20 teams) and a

Document is deleted from original location.
Use the Download Button below to download from the Web Archive.

Download Document from Web Archive

File Size: 157,64 KB