Back to Results
First PageMeta Content



Scoping Form Proposed Infrastructure Needs and Habitat Improvement at Mission Creek—Mission Bridge, National Bison Range—Flathead Indian Reservation July-August 2009
Add to Reading List

Document Date: 2010-07-28 17:31:00


Open Document

File Size: 3,31 MB

Share Result on Facebook

Company

IDT / Lake Co. / Google / /

Event

Environmental Issue / /

Facility

The bridge / Bridge Inspection / E. Bridge Current Condition Abutment / Current bridge / Abutment These / Mission Creek Bridge / Bridge Size / Mission Bridge / /

IndustryTerm

straight road access to equipment / large farm equipment / petroleum products / large machinery / heavy equipment contractor / machinery / pre-fabricated steel bridge / steel bridge / large equipment / wider steel bridge / road infrastructure / large maintenance machinery / /

NaturalFeature

Constrains Mission Creek / Mission Creek / /

Organization

Potential IDT / U.S. Securities and Exchange Commission / Creston Office / Environmental Protection Agency / US Fish and Wildlife Service / /

Person

Lowell Whitney / Craig Barfoot / Mike Durglo / Dan Lipscomb / Lowell Whitney Craig Barfoot / Rusty Sydnor / Rose Leach / Seth Makepeace / Lester Bigcrane / Jeff King / /

/

Position

Contractor / guard / Hydro-Geologist / County Leader / USFWS Fisheries Biologist / Restoration Botanist / heavy equipment contractor / CSKT restoration botanist / Hydrologist / Fisheries Biologist / /

Product

Move / /

ProvinceOrState

Nebraska / /

URL

http /