Back to Results
First PageMeta Content
Lake Agassiz / Bridge / Structural engineering / Deep foundation / Geotechnical engineering


Microsoft Word - BL1204987_KENNEDY BRIDGE REHABILITATION_GEOTECHNICAL EVALUATION REPORT_Final
Add to Reading List

Document Date: 2014-07-30 08:55:00


Open Document

File Size: 860,10 KB

Share Result on Facebook

City

East Grand Forks / Report / Grand Forks / Argusville / /

Company

Goose River Group / CH2M Hill / Braun Intertec Corporation / Boring No. / Crow Wing River Group / United States Army Corp / Link-Belt / /

Country

United States / Canada / /

Event

Natural Disaster / /

Facility

Existing Bridge / Geotechnical Conditions Memorandum Kennedy Bridge Planning Study US Trunk Highway / Michael’s Hospital / US Trunk Highway / Bridge Inspection/Inventory / Kennedy Bridge / /

IndustryTerm

bank erosion / steel high trusses / bank / river bank / outer bank / /

Movie

Red River Valley / D.2 / /

NaturalFeature

Lake Winnipeg / Lake Agassiz / /

Organization

St. Michael’s Hospital / Minnesota Department of Transportation / United States Army / North Dakota Department of Transportation / University of Minnesota / /

Person

Megan J. L. Hoppe / /

Position

Project Engineer / Licensed Professional Engineer / /

ProvinceOrState

Minnesota / North Dakota / /

SocialTag