Back to Results
First PageMeta Content
Visual arts / Geotechnical engineering / Retaining wall / Structural system / Gateway Arch / Floor plan / Pattern / Architecture / Technical drawing / Design


Issues addressed on September 21, 2012 Bridge Contractors/Caltrans meeting identified the following issues: 1. Treatments that are designed to imprint inward cost more money to construct. The outward designs are more
Add to Reading List

Document Date: 2013-05-16 22:44:05


Open Document

File Size: 1,76 MB

Share Result on Facebook

Company

CC Myers Inc. / /

Facility

Bridge Architecture / /

IndustryTerm

use texture detail applications / /

Organization

office of Transportation Architecture / Division of Engineering Services / /

Person

Powell Constructors / George Delano (Granite) / Mike Finley (Brutoco) / Mike Powell / /

Position

structure designer / Designer and Architect / /

SocialTag