Back to Results
First PageMeta Content
Pipeline and Hazardous Materials Safety Administration / Pipeline transport / Corrective and preventive action / Management / Business / Oil pipelines / Technology


APR[removed]VIA FEDERAL EXPRESS AND FACSIMILE TO: [removed]Mr. Julio Rios President Bridger Lake, LLC
Add to Reading List

Document Date: 2010-05-02 21:04:42


Open Document

File Size: 44,79 KB

Share Result on Facebook

City

Denver / Washington / DC / Shreveport / Robertson / /

Company

Lone Star Steel Company / Bridger Lake LLC / /

Event

Man-Made Disaster / Product Issues / /

Facility

State Highway / Respondent’s pipeline system / Affected Pipeline Facility / Pipeline Safety Laws / Pipeline Safety Regulations / Pipeline Safety / Phillips Pipeline / pipeline ROW / United States District Court / Pipeline Safety Enclosures / /

IndustryTerm

heavy equipment / mechanical and metallurgical testing protocols / spill site / crude oil / sweet crude oil / failure site / /

NaturalFeature

Julio Rios President Bridger Lake / /

Organization

United States District Court / office of Pipeline Safety / Pipeline and Hazardous Materials Administration / U.S. DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION OFFICE OF PIPELINE SAFETY WASHINGTON / Nuclear Regulatory Commission / Wyoming Department of Environmental Quality / /

Person

Jeffrey D. Wiese / John Martin / /

/

Position

Director / Western Region / operations manager / inspector / MP / Administrator for Pipeline Safety / contractor / Julio Rios President / Director / Attorney General for appropriate relief / CAO / Administrator / Director at the same time / representative / Director to the Associate / /

Product

liquid pipeline / soil / liquid pipeline facility / /

ProvinceOrState

Uinta County / Wyoming / Louisiana / Summit County / Utah / Colorado / /

Region

Northern Utah / Southwestern Wyoming / /

Technology

mechanical and metallurgical testing protocols / /

SocialTag