Büren

Results: 740



#Item
171Asbestos / Elevator / HVAC / Floor / Curtain wall / Water heating / Plumbing / Basement / Precast concrete / Architecture / Construction / Building engineering

FACILITY AUDIT REPORT DREESE LABORATORIES, Bldg 279 JUNE 1995 Prepared by: Augustus J. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
172Structural system / Elevator / Basement / HVAC / Floor / Architecture / Building engineering / Construction

FACILITY AUDIT REPORT CALDWELL LABORATORY #26 MAY 1997 Prepared by: Augustus J.R. Van Buren The Ohio State University

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
173Visual arts / Structural system / Building materials / Home / Bathrooms / Plumbing / Elevator / Asbestos / HVAC / Architecture / Construction / Building engineering

FACILITY AUDIT REPORT ARCHER HOUSE, Bldg 261 MAY 15, 1994 Prepared by: Augustus J.R. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
174Rooms / Structural engineering / Subterranea / Elevator / Asbestos / Engineering / Environment / Technology / Old Faithful Historic District / Basement / Building engineering / Food storage

FACILITY AUDIT REPORT DERBY HALL #025 JANUARYPrepared by: Augustus J.R. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
175Building biology / Technology / Engineering / Rooms / Mechanical engineering / HVAC / Asbestos / Mechanical room / Elevator / Heating /  ventilating /  and air conditioning / Architecture / Building engineering

FACILITY AUDIT REPORT BIOLOGICAL SCIENCES BUILDING, Bldg 276 JULY 1995 Prepared by: Augustus J.R. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
176Basement / Elevator / Asbestos / Plumbing / HVAC / Floor / Air conditioner / Architecture / Building engineering / Construction

FACILITY AUDIT REPORT HAGERTY HALL, Bldg 037 MARCH 1995 Prepared by: A.J.R. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
177The Loop / Millennium Station / Union Station / Quincy / LaSalle Street Station / Chicago Loop / LaSalle/Van Buren / Blue Line / Chicago River / Chicago Transit Authority / Illinois / Chicago metropolitan area

LoopLink_LogoReversed_FINAL

Add to Reading List

Source URL: www.brtchicago.com

Language: English - Date: 2015-03-02 10:32:04
178Building engineering / Technology / Building materials / Building biology / Structural system / Basement / Floor / Fan coil unit / Air conditioner / Architecture / Construction / Heating /  ventilating /  and air conditioning

FACILITY AUDIT REPORT CENTRAL SERVICE, Bldg 077 APRIL 1996 Prepared by: Augustus J.R. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
179Building engineering / Rooms / Structural system / Basement / Structural engineering / Elevator / Asbestos / Water heating / Floor / Architecture / Construction / Heating /  ventilating /  and air conditioning

FACILITY AUDIT REPORT CONVERSE HALL #056 SEPTEMBER 30, 1996 Prepared by: Augustus J.R. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2005-07-07 14:45:09
180Engineering / Elevator / Mechanical room / HVAC / Asbestos / Chiller / Floor / Heating /  ventilating /  and air conditioning / Architecture / Construction

FACILITY AUDIT REPORT BOYD LABORATORY #110 FEBRUARYPrepared by: Augustus J. R. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
UPDATE