Back to Results
First PageMeta Content
Environmental science / Aquifers / Geotechnical engineering / Enbridge / Borehole / Soil test / Water quality / Soil / Groundwater / Soft matter / Water / Matter


Approved Enbridge Line 6B MP 608 Marshall, MI Pipeline Release Remedial Investigation Work Plan for Kalamazoo River (MP 3.14 to Ceresco Dam (MP 5.80))
Add to Reading List

Document Date: 2014-02-08 10:54:23


Open Document

File Size: 3,24 MB

Share Result on Facebook

City

Ceresco / Marshall / /

Company

Michigan Natural Resources / Total petroleum / Right Descending Banks / Project Plan RDB Right Descending Bank RI / Enbridge Energy Limited Partnership / Overbank / DRO GRO / Environmental Quality Enbridge Energy Limited Partnership / Left Descending Bank The / Custody Enbridge Energy Limited Partnership / Enbridge Energy Partners L.P. / /

Country

Netherlands / /

EntertainmentAwardEvent

OSCAR / /

Event

FDA Phase / /

Facility

Ceresco Dam / Pipeline Release Remedial Investigation Work Plan / /

IndustryTerm

bentonite chips / suspected residual oil impacts / similar device / residual oil / crude oil / unverified excavation/oil removal areas / oil range organics / river bank / oil / residual oil impact / chemical analysis / oil areas / /

NaturalFeature

Talmadge Creek / Kalamazoo River / /

Organization

United States Environmental Protection Agency / Michigan Michigan Department of Environmental Quality Administrative / UV / Team / Michigan Department of Environmental Quality / Environmental Protection Agency / /

Position

Line 6B MP / Kalamazoo River Remedial Investigation MP / MP / representative / Lead/Geologist / /

Product

Agency UV Ultraviolet VOCs Volatile Organic Compounds / EN-301 / /

ProvinceOrState

Rhode Island / Michigan / /

Technology

GIS / bentonite chips / GPS / /

SocialTag