Back to Results
First PageMeta Content
Sai Kung District / Ho Chung / Sai Kung Town / Che Kung Miu / Hong Kong / New Territories / Sai Kung Peninsula


Drainage Improvements in Sai Kung PROJECT PROFILE November 2001 CONTENTS Page
Add to Reading List

Document Date: 2001-11-02 03:07:31


Open Document

File Size: 550,67 KB

Share Result on Facebook

Company

BE INCORPORATED / ENVIRONMENTAL PROTECTION MEASURES INCORPORATED / Coastal / /

Event

Product Issues / Natural Disaster / /

Facility

Che Kung Temple / NA NA Che Kung Temple / NA NA NA NA NA NA Fet Kong Temple / Hiram’s Highway / Berkeley Bay Villa / Sai Kung catchment / Chemical Waste Treatment Facility / ATV studio / NA Hiram’s Highway / /

IndustryTerm

by-products / drainage systems / construction site / chemical wastes / bank / left bank / upstream right bank / acoustic machinery enclosures / bank raising / e.g. steel / bank-tops / grasscrete banks / opposite bank / /

NaturalFeature

Ho Chung River / Kong river / Sai Kung River Pak Kong River Ho Chung River / Sai Kung River / Pak river / Pak Kong River / /

Organization

Project Proponent Drainage Services Department / Civil Engineering Department / Freemasonry / /

Person

Chung River Existing / Tai Chung Hau / Lee Kum Kee / Tai Mong / Chung River Roads Tai Mong / /

/

Position

contractor / CPA / Major / /

Product

sediments / material Disruption / run-off Generation / /

ProvinceOrState

Sai Kung / /

Technology

DSD / /

SocialTag