Back to Results
First PageMeta Content
Sustainable building / Environment / Low-energy building / Sustainable architecture / Environmental design / Clackamas High School / Leadership in Energy and Environmental Design / New-construction building commissioning / Boora Architects / Architecture / Building engineering / Construction


BUILDING COMMISSIONING for better public buildings CASE STUDY DISTRICT VERIFIES DELIVERY OF A GREEN ENERGY-EFFICIENT SCHOOL When the North Clackamas School District outside
Add to Reading List

Document Date: 2008-04-16 20:19:59


Open Document

File Size: 133,88 KB

Share Result on Facebook

Company

PROJECT PARTNERS / /

Currency

USD / /

/

Event

Product Issues / /

Facility

BUILDING COMMISSIONING / BUILDING COMMISSIONING CASE STUDY COMMISSIONING BENEFITS / North Clackamas High School COMMISSIONING QUICK FACTS Building / /

IndustryTerm

energy costs / electricity / electricity usage / maintenance protocol / energy-efficient products / natural gas usage / Annual energy savings / natural gas / electric utilities / state energy code / less energy / low-toxicity building products / energy savings / public interest groups / non-profit / energy / /

Organization

U.S. Green Building Council / North Clackamas School District / David Church / North Clackamas High School / Clackamas High School / The Alliance / OREGON DEPARTMENT OF ENERGY / /

Person

Josh Welborn / Michael Mathers / /

/

Position

Facilities Manager / general contractor / Construction Manager / /

Product

carbon dioxide sensors / /

ProvinceOrState

Oregon / /

Technology

maintenance protocol / /

URL

www.energy.state.or.us / www.BetterBricks.com / www.boora.com / www.betterbricks.com/commissioning / www.interfaceengineering.com / /

SocialTag