Back to Results
First PageMeta Content
Geography of the United States / Keechelus Lake / Kachess Lake / Yakima River / Cle Elum Lake / Kittitas County /  Washington / Washington / Wenatchee National Forest


Yakima River Basin Study Keechelus to Kachess Pipeline Technical Memorandum U.S. Bureau of Reclamation Contract No. 08CA10677A ID/IQ, Task 4.6
Add to Reading List

Document Date: 2013-01-25 12:30:29


Open Document

File Size: 1,82 MB

Share Result on Facebook

Company

HDR Engineering Inc / /

Facility

Kachess Pipeline / Pipeline Flows / Outfall Pipeline / Wapatox Power Plant / Kittitas Reclamation District Main Canal / Pipeline Alignment / K pipeline / Pressures The pipeline / Cle Elum Dam / Pipeline Alignment Figure / Pipeline Alignment Topography / Hydraulic Analysis The pipeline / /

IndustryTerm

steel pipeline / steel wye branch / diffuser energy dissipation end section / energy recovery hydropower system / /

NaturalFeature

Yakima River / Lake Keechelus/Lake Kachess / Swamp Lake / Lake Kachess / Lake Keechelus / Swamp Creek / lake Lake Kachess / /

Organization

Washington State Department / Bureau of Reclamation / Ecology office of Columbia River / Department of the Interior / Kachess Pipeline Technical Memorandum U.S. Bureau / /

Position

remaining head / General / residual head / /

ProvinceOrState

Washington / /

Region

central Washington / /

SocialTag