<--- Back to Details
First PageDocument Content
Petroleum production / Fluid dynamics / Oil wells / Mechanical engineering / Oilfield terminology / Completion / Centrifugal pump / Extraction of petroleum / Water well / Pumps / Fluid mechanics / Petroleum
Date: 2013-10-31 18:17:44
Petroleum production
Fluid dynamics
Oil wells
Mechanical engineering
Oilfield terminology
Completion
Centrifugal pump
Extraction of petroleum
Water well
Pumps
Fluid mechanics
Petroleum

CHOPS - Cold Heavy Oil Production with Sand in the Canadian Heavy Oil Industry 6 CANADIAN CHOPS PRODUCTION PRACTICES 6.1 Initiating and Sustaining Sand Influx To initiate sand influx, the following completion practices

Add to Reading List

Source URL: www.energy.alberta.ca

Download Document from Source Website

File Size: 579,04 KB

Share Document on Facebook

Similar Documents

Bishop Burton and Walkington Liaison Committee (Crawberry Hill)

Bishop Burton and Walkington Liaison Committee (Crawberry Hill)

DocID: 1gE6m - View Document

Review	
  of	
  Environmental	
  Impact	
  Study	
  for	
  Repsol’s	
   Proposed	
  2014	
  Exploratory	
  Offshore	
  Drilling,	
  Canary	
   Islands,	
  Spain.	
  	
     Expert	
  Report	
  	
   P

Review  of  Environmental  Impact  Study  for  Repsol’s   Proposed  2014  Exploratory  Offshore  Drilling,  Canary   Islands,  Spain.       Expert  Report     P

DocID: 1gDWD - View Document

Fracture Characterization  Integrating datasets from complex operations of importance for CO2 storage Braathen, A. and Olaussen, S. on behalf of the project Poster produced by: Senger, K., Ogata, K. and; Braathen, C.

Fracture Characterization Integrating datasets from complex operations of importance for CO2 storage Braathen, A. and Olaussen, S. on behalf of the project Poster produced by: Senger, K., Ogata, K. and; Braathen, C.

DocID: 1grU0 - View Document

Progress Reports  Estimation of Minimum Principal Stress from an Extended Leak-off Test Onboard the Chikyu Drilling Vessel and Suggestions for Future Test Procedures by Weiren Lin, Koji Yamamoto, Hisao Ito, Hideki Masago

Progress Reports Estimation of Minimum Principal Stress from an Extended Leak-off Test Onboard the Chikyu Drilling Vessel and Suggestions for Future Test Procedures by Weiren Lin, Koji Yamamoto, Hisao Ito, Hideki Masago

DocID: 1gpMz - View Document

PRD Energy Announces Operational Update CALGARY, ALBERTA – September 16, 2013, PRD Energy Inc. (

PRD Energy Announces Operational Update CALGARY, ALBERTA – September 16, 2013, PRD Energy Inc. ("PRD" or the "Company") (TSXV: PRD) announced an operational update for the drilling of the Boerger 7A well. After setting

DocID: 1gkt6 - View Document