<--- Back to Details
First PageDocument Content
Western United States / United States Bureau of Reclamation / Grand Coulee Dam / John W. Keys / Columbia Basin Project / Glen Canyon Dam / Elwood Mead / Quincy-Columbia Basin Irrigation District / Lake Mead / Dams / Washington / Colorado River
Date: 2014-07-09 09:59:47
Western United States
United States Bureau of Reclamation
Grand Coulee Dam
John W. Keys
Columbia Basin Project
Glen Canyon Dam
Elwood Mead
Quincy-Columbia Basin Irrigation District
Lake Mead
Dams
Washington
Colorado River

TRANSCRIPT John W. Keys III Pump-Generating Plant Dedication Ceremony May 12, 2009 Remarks by Ken Lane Senior Advisor to the Secretary of the Interior, DOI It is a privilege for me to take part in this event honoring a t

Add to Reading List

Source URL: www.usbr.gov

Download Document from Source Website

File Size: 36,80 KB

Share Document on Facebook

Similar Documents

2015 Accomplishments Protecting and Restoring Streamflows and Rivers Fielder and Wimer Dam Removals In 2015, WaterWatch and project partners removed Fielder and Wimer dams from Evans Creek in the Rogue Basin. These two o

2015 Accomplishments Protecting and Restoring Streamflows and Rivers Fielder and Wimer Dam Removals In 2015, WaterWatch and project partners removed Fielder and Wimer dams from Evans Creek in the Rogue Basin. These two o

DocID: 1pk8n - View Document

Appendices to The Marine Ecology of Juv Columbia River  Basin Salmonids_2012.pdf

Appendices to The Marine Ecology of Juv Columbia River Basin Salmonids_2012.pdf

DocID: 19ZXJ - View Document

Project Title: Yakima River Basin Integrated Plan Headline Title (2-5 words): Yakima River Basin Integrated Plan Brief Summary (Abstract): The Yakima Basin Integrated Plan is a 30-year, $3.8 billion plan that restores th

Project Title: Yakima River Basin Integrated Plan Headline Title (2-5 words): Yakima River Basin Integrated Plan Brief Summary (Abstract): The Yakima Basin Integrated Plan is a 30-year, $3.8 billion plan that restores th

DocID: 15bhC - View Document

IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 05-07: Water Quality – Arrow Lakes G.S., Canada Key Issues: 5- Water Quality 1-Bio

IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 05-07: Water Quality – Arrow Lakes G.S., Canada Key Issues: 5- Water Quality 1-Bio

DocID: 11qvj - View Document

Bureau of  Reclamation Mission – The Bureau of Reclamation’s mission is to manage, develop, and protect water and related resources in an environmentally and economically sound manner

Bureau of Reclamation Mission – The Bureau of Reclamation’s mission is to manage, develop, and protect water and related resources in an environmentally and economically sound manner

DocID: ZhNN - View Document