Back to Results
First PageMeta Content
Computing / Scheduling algorithms / Noop scheduler / Native Command Queuing / Deadline scheduler / I/O scheduling / Scheduling / Command queue / Advanced Host Controller Interface / Serial ATA / Operations research / Computer hardware


NCQ vs. I/O Scheduler: Preventing Unexpected Misbehaviors YOUNG JIN YU, DONG IN SHIN, HYEONSANG EOM, and HEON YOUNG YEOM
Add to Reading List

Document Date: 2010-11-18 13:27:58


Open Document

File Size: 1,19 MB

Share Result on Facebook

City

Seoul / New York / /

Company

ACM Inc. / Intel / IDC / /

Country

South Korea / United States / /

Currency

USD / /

/

Facility

Penn Plaza / Institute of Computer Technology / Seoul National University / /

/

IndustryTerm

elevator algorithm / intelligent devices / synthetic benchmark tool / optimization technology / devname block device / pre/post processing / software-level approaches / software/hardware features / disk device / naive solution / /

MusicAlbum

I/O / /

MusicGroup

D. I. / /

OperatingSystem

Linux / /

Organization

IN SHIN / HYEONSANG EOM / and HEON YOUNG YEOM Distributed Computing System Lab. / Distributed Computing System Lab. / Seoul National University / Computer Systems Organization / DMA / Institute of Computer Technology / /

/

Position

synchronous I/O. The scheduler / driver / nonwork-conserving scheduler / Noop scheduler / I/O scheduler / FIFO scheduler / device driver / and becomes active / Measurements General / I/O scheduler / and breaks the assumption / Anticipatory scheduler / Redundant Scheduling An I/O scheduler / representative / device driver / scheduler / NCQ vs. I/O Scheduler / Deadline scheduler / controller / corresponding author / /

ProvinceOrState

New York / /

Technology

complicated protocol / Linux / elevator algorithm / disk drive / optimization technology / Operating Systems / /

URL

http /

SocialTag