Back to Results
First PageMeta Content
Visual arts / Submittals / Shop drawing / Washington State Department of Transportation / Precast concrete / Concrete / Architecture / Construction / Building engineering


QC 5 - Standard Practice for Ground Granulated Blast-Furnace Slag Producers/Importers/Distributors That Certify Ground Granulated Blast-Furnace Slag - Materials Manual - M 46-01
Add to Reading List

Document Date: 2014-12-24 11:16:06


Open Document

File Size: 412,86 KB

Share Result on Facebook

Company

Reinforcing Steel / Epoxy Coated Reinforcing Steel / Fabricating Reinforcing Steel / /

Continent

America / /

Facility

Prestress Plant Inspection Audit Plant / Plant Approval Status After Initial Approval / Plant Submittal Requirement / Plant Reviewed / WSDOT Bridge / Concrete Ready Mix Batch Plant / Prestressed Concrete Institute / /

IndustryTerm

adequate equipment / temperature measuring equipment / plants manufacturing process / manufacturing facilities / cement / cement storage / cement certifications / steel / /

Organization

International Congress / WSDOT Bridge Construction Office / WSDOT Bridge and Structures Office / National Ready Mix Concrete Association / Concrete Association / Precast/Prestressed Concrete Institute / Washington State Department of Transportation / International Criminal Court / Fabrication Inspection Office / /

Person

Radiant Hot / /

Position

WSDOT Fabrication Inspector / Fabrication Inspector / WSDOT HQ Materials Laboratory Structural Materials Testing Engineer / inspector / Coatings Engineer and a supervising inspector / stripping strength representative / Quality Assurance inspector / Coatings Engineer / Fabrication and Coatings Engineer / plant manager / production manager / and quality control manager / quality control manager / or their respective representatives / /

Technology

RAM / /

SocialTag