First PageMeta Content
Blach Intermediate School / Collaborative for High Performance Schools / Design / Ship commissioning / Construction management / Submittals / Constructability / New-construction building commissioning / Building engineering / Architecture / Construction


Commissioning A Tale of Two Districts: Third-Party vs. In-House Commissioning tracked the issues that had been identified, Georgina Blach Intermediate School, Los Altos, CA
Add to Reading List

Document Date: 2008-04-16 20:20:33


Open Document

File Size: 156,84 KB

Share Result on Facebook

City

Los Altos / /

Company

Keithly Welsh Associates / PG&E / /

IndustryTerm

job site / fire alarm systems / low voltage systems / energy efficiency measures / expected energy savings / /

Organization

Los Altos Unified School District / Georgina Blach Intermediate School / Division of the State / South Pasadena Unified School District / /

Person

Lawrence Schadt / Georgina Blach / /

Position

advocate / Director of Facilities Bob Vanderwall / good HVAC technician / construction manager / architect / District Director / Inspector / /

SocialTag