Back to Results
First PageMeta Content
Grand Coulee Dam / Columbia Basin Project / United States Bureau of Reclamation / Columbia River / TPP Nikola Tesla / Environmental impact assessment / Dams / Washington / Environment


TPP Overhaul MOA FINAL Signed[removed]
Add to Reading List

Document Date: 2013-01-25 10:28:06


Open Document

File Size: 2,91 MB

Share Result on Facebook

City

Spokane / Washington / /

Company

Reclamation / Waste management / /

Country

Columbia / /

Facility

Grand Coulee Dam / Background Grand Coulee Dam / Separate Material Storage Building / The Federal Columbia River Power System / /

IndustryTerm

electricity / oil/water separator capacity / transportation / adverse transportation impacts / excessive causing drainage systems / oil / auxiliary equipment / oil/water separator / /

NaturalFeature

Snake rivers / Columbia River / /

Organization

Tribal Historic Preservation Office / U.S. Department of the Interior Bureau of Reclamation Pacific Northwest Region Grand Coulee Power office Grand Coulee / State Historic Preservation Office / U.S. Department of the Interior Bureau of Reclamation Grand Coulee Power office PN FONSI / Bureau of Reclamation / Federal government / Consultation and Coordination National Historic Preservation Act / Bonneville Power Administration / United States Army / Council on Environmental Quality / Tribal Employment Rights Office / Advisory Council on Historic Preservation / U. S. DEPARTMENT OF THE INTERIOR / /

Position

contractor / /

ProvinceOrState

Washington / /

Region

central Washington / /

Technology

2005 protocol / /

SocialTag