Back to Results
First PageMeta Content
Environment / Earth / United States / Environmental impact statement / Environmental science / Impact assessment


FHWA-TX-EIS[removed]F US 181 Improvements from Beach Avenue to Morgan Avenue at the Crosstown Expressway/Final Section 4(f) Evaluation, Harbor Bridge Project; Nueces County, Texas; Final Environmental Impact Statement (F
Add to Reading List

Document Date: 2014-12-17 16:26:25


Open Document

File Size: 393,11 KB

Share Result on Facebook

City

Crosstown / /

Company

Participating / Cooperating / HDR Inc. / TxDOT / /

Country

United States / US / /

Currency

USD / /

Event

Natural Disaster / Force Majeure / Business Partnership / Person Communication and Meetings / /

Facility

Breakwater Avenue / Tunnel Alternatives / State Highway / Inner Harbor / Bridge Design Manual / Tunnel Alternative The Tunnel Alternative / Harbor Bridge / Port of Corpus Christi / Harbor Bridge EIS / Harbor Bridge EIS Team / Upgrades facility / bridge As / Transportation System Management The TSM Alternative / Crosstown Expressway / Tunnel Alternative / USS Lexington museum / Highway Operability / /

Holiday

Corpus Christi Day / /

IndustryTerm

travel delay / transportation / transportation routes / non-steel structure / steel corrosion / transportation network / long-term solution / long-term solutions / steel bridge / hurricane evacuation network / steel structure / /

MusicAlbum

Green / West / Red / Orange / Tunnel / /

NaturalFeature

Corpus Christi Bay / Corpus Christi Ship Channel / Corpus Christi Beach / /

Organization

TxDOT Bridge Division / Texas Department of Public Safety / United States Army / Department of Transportation Act / Division of Emergency Management / TSM Alternative / NHS / /

ProvinceOrState

Texas / /

SocialTag