Back to Results
First PageMeta Content
Thames Water / Sewerage / Geography of England / Water pollution / Environmental engineering / Combined sewer / Tideway / River Thames / Crossness / Civil engineering / London / London water infrastructure


Microsoft Word[removed]RG-PNC[removed]Needs Report.doc
Add to Reading List

Document Date: 2011-07-08 11:52:52


Open Document

File Size: 1.019,55 KB

Share Result on Facebook

City

Helsinki / Paris / Stockholm / Beckton / Vienna / London / Naples / /

Company

Thames Water / Coastal / TTSS Steering Group / Ofwat / Steering Group / /

Country

United Kingdom / UK / /

Currency

GBP / /

Event

Natural Disaster / Environmental Issue / /

Facility

Lee Tunnel / Teddington weir / Introduction The Thames Tunnel / Coastal Waters Catchment / London’s sewer system / Thames Tunnel / /

IndustryTerm

transportation / storage tunnel solution / sewer networks / potential solutions / interceptor sewer systems / sewer systems / sewerage network / sustainable drainage systems / suitable cost effective solutions / urban waste water collecting systems / lowest cost solution / identified tunnel solutions / sewerage infrastructure / /

NaturalFeature

River Lee / Thames river / River Thames / Thames Estuary / River Thames/ Rotherhithe / /

Organization

Infrastructure Planning Commission / UK Government / TTSS Government / Environment Agency / European Commission / European Court of Justice / European Union / /

Person

Chris Binnie / Abbey Mills / Caroline Spelman / Joseph Bazalgette / Lee Tunnels / Ian Pearson / Hilary Benn / /

Position

Minister of State / Model development work / Minister / Chief Executive Officer / Secretary / Secretary of State / Professor / EXECUTIVE / Major / /

Technology

alternative options Alternative technologies / /

SocialTag