<--- Back to Details
First PageDocument Content
Battery electricity) / Lithium / Lithium battery / Battery / British Standards / Rechargeable battery / C battery / Conformance testing / D battery / Type approval / Uninterruptible power supply
Date: 2014-01-02 05:20:07
Battery electricity)
Lithium
Lithium battery
Battery
British Standards
Rechargeable battery
C battery
Conformance testing
D battery
Type approval
Uninterruptible power supply

Ministry of Defence INTERIM Defence StandardIssue 5

Add to Reading List

Source URL: www.megacycles.co.uk

Download Document from Source Website

File Size: 221,52 KB

Share Document on Facebook

Similar Documents

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase electricity meter communicating on one phase. Testing was performed on ph

DocID: 1veLU - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase meter communicating on 1 phase. Testing was performed on phase 1. Operatin

DocID: 1vbgd - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase electricity meter communicating on 3 phases. Testing was performed on pha

DocID: 1vbeT - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase data concentrator communicating on three phases. Testing was performed on

DocID: 1v86w - View Document

The Testcenter facility ‘LoRa® Test Lab’ within IMST GmbH is recognized by the LoRa™ Alliance for testing in accordance to the LoRaWAN™ Specification V1.0.1 Report for Test of Conformance to LoRaWAN™ V1.0.1 fo

DocID: 1uXQP - View Document