Eastern Interconnection / North American Electric Reliability Corporation / Electric power transmission systems / FirstEnergy / Power outage / Federal Energy Regulatory Commission / Regional transmission organization / Detroit Edison / Electrical grid / Energy in the United States / Electric power / Energy
Date: 2012-12-07 11:11:52
Eastern Interconnection
North American Electric Reliability Corporation
Electric power transmission systems
FirstEnergy
Power outage
Federal Energy Regulatory Commission
Regional transmission organization
Detroit Edison
Electrical grid
Energy in the United States
Electric power
Energy

MICHIGAN PUBLIC SERVICE COMMISSION REPORT BLACKOUT OF AUGUST 14, 2003 EXECUTIVE SUMMARY The August 14, 2003 blackout was a wake-up call concerning reliability of our nation’s electric grid. What started out as a typica

Add to Reading List

Source URL: www.michigan.gov

Download Document from Source Website

File Size: 76,29 KB

Share Document on Facebook

Similar Documents

Automated Vulnerability Analysis of AC State Estimation under Constrained False Data Injection in Electric Power Systems Sicun Gao1 , Le Xie2 , Armando Solar-Lezama1 , Dimitrios Serpanos3 , and Howard Shrobe1 Abstract—

Automated Vulnerability Analysis of AC State Estimation under Constrained False Data Injection in Electric Power Systems Sicun Gao1 , Le Xie2 , Armando Solar-Lezama1 , Dimitrios Serpanos3 , and Howard Shrobe1 Abstract—

DocID: 1xU8c - View Document

March 20, 2018  Kyushu Electric Power Company Inc. Rejection of the Temporary Injunction against Restart of Genkai Nuclear Power Station Units No.3 and 4

March 20, 2018 Kyushu Electric Power Company Inc. Rejection of the Temporary Injunction against Restart of Genkai Nuclear Power Station Units No.3 and 4

DocID: 1vrhI - View Document

TRANSFORMER  Power Planar Magnetics and Hybrid Electric Vehicles The HEVs are here – and more are coming The electronic circuits in a hybrid electric vehicle must operate in an extreme temperature

TRANSFORMER Power Planar Magnetics and Hybrid Electric Vehicles The HEVs are here – and more are coming The electronic circuits in a hybrid electric vehicle must operate in an extreme temperature

DocID: 1vn7A - View Document

Where Does Our Electric Power Come From? Since November 1, 2014, the Kirkwood Meadows Public Utility District has purchased all of its power (except for emergency diesel generation) off of the Western power grid. Grid po

Where Does Our Electric Power Come From? Since November 1, 2014, the Kirkwood Meadows Public Utility District has purchased all of its power (except for emergency diesel generation) off of the Western power grid. Grid po

DocID: 1vip9 - View Document

profiles Modernization and refurbishment of San Miguel Electric Cooperative’s Rothemühle® regenerative heat exchanger results in a 3 MW savings in plant auxiliary power. Recent upgrades to the Rothemühle regenerativ