<--- Back to Details
First PageDocument Content
Geography of Antarctica / Ice core / Dome F / Drilling rig / European Project for Ice Coring in Antarctica / Integrated Ocean Drilling Program / Scientific drilling / Drilling / Dome C / Geochronology / Physical geography / Geology
Date: 2014-12-05 03:19:01
Geography of Antarctica
Ice core
Dome F
Drilling rig
European Project for Ice Coring in Antarctica
Integrated Ocean Drilling Program
Scientific drilling
Drilling
Dome C
Geochronology
Physical geography
Geology

Progress Reports The Second Deep Ice Coring Project at Dome Fuji, Antarctica by Hideaki Motoyama doi:iodp.sd

Add to Reading List

Source URL: www.sci-dril.net

Download Document from Source Website

File Size: 243,04 KB

Share Document on Facebook

Similar Documents

PDF Document

DocID: 1x4rS - View Document

SPEUsing Semantic Technology to Auto-generate Reports: Case Study of Daily Drilling Reports Martin Giese, Univ. of Oslo; Jens I. Ornæs, National Oilwell Varco; Lars Overå, PCA; Inge Svensson, Baker Hughes; Aril

SPEUsing Semantic Technology to Auto-generate Reports: Case Study of Daily Drilling Reports Martin Giese, Univ. of Oslo; Jens I. Ornæs, National Oilwell Varco; Lars Overå, PCA; Inge Svensson, Baker Hughes; Aril

DocID: 1vnKe - View Document

NELSON  5. Use the plastic back plate to mark the position of screw holes onto mounting surface. Drill the wall to depth of about 4cm and fit the wall plugs (supplied) . Care should be taken to avoid drilling or screwing

NELSON 5. Use the plastic back plate to mark the position of screw holes onto mounting surface. Drill the wall to depth of about 4cm and fit the wall plugs (supplied) . Care should be taken to avoid drilling or screwing

DocID: 1vlxJ - View Document

Register 213, AprilMISCELLANEOUS BOARDS 20 AACc)(13) is amended to read: (13) a copy of the proposed drilling program; the drilling program must indicate

Register 213, AprilMISCELLANEOUS BOARDS 20 AACc)(13) is amended to read: (13) a copy of the proposed drilling program; the drilling program must indicate

DocID: 1vjVe - View Document

Microsoft WordASX Lake Roe Commencement of Drilling_Final

Microsoft WordASX Lake Roe Commencement of Drilling_Final

DocID: 1vhZf - View Document