Back to Results
First PageMeta Content
Particle accelerators / Beamline / KEK / EPICS / Quadrupole magnet / Magnet / Dipole magnet / Quadrupole / Power supply / Physics / Electromagnetism / Magnetism


3 PF-AR 3-1 Operation Summary The KEK B factory (KEKB), which shares the beam transport (BT) line with PF-AR, was shut down on June 30, 2010 and the upgrade toward the Super KEKB will continue until FY2014. At the same t
Add to Reading List

Document Date: 2012-02-26 20:01:45


Open Document

File Size: 225,21 KB

Share Result on Facebook

Event

Natural Disaster / /

Facility

Operation Summary The KEK B factory / /

IndustryTerm

transistor bank / stored energy / user local network / low energy ring / injection energy / signal processing system / insertion device / rubber hose / /

OperatingSystem

VxWorks / Linux / /

Position

ID Server LAN/GPIB LAN/GPIB Router Router BL-NE1 VME VxWorks BL-NW14 PC Linux ID Controller ID Controller / input-output controller / current regulation controller / KEKB Network LAN/GPIB LAN/GPIB Soft IOC ID Server BL-NE1 ID Controller ID Controller / data logger / ID controller / KEKB Network Hard IOC ID Server LAN/GPIB LAN/GPIB Router Router BL-NE1 VME VxWorks BL-NW14 PC Linux ID Controller / /

Product

PF-AR injection / /

ProgrammingLanguage

DC / /

Technology

LAN / RAM / X-ray / KEKB Network Hard IOC ID Server LAN/GPIB LAN/GPIB Router Router / Linux / VxWorks / /

SocialTag