<--- Back to Details
First PageDocument Content
Petroleum production / Petroleum geology / Petroleum engineering / Oil wells / Drilling rig / Drill / Drifter / Technology / Petroleum / Oilfield terminology
Date: 2013-12-10 00:12:34
Petroleum production
Petroleum geology
Petroleum engineering
Oil wells
Drilling rig
Drill
Drifter
Technology
Petroleum
Oilfield terminology

Drill string falls from production hole

Add to Reading List

Source URL: mines.industry.qld.gov.au

Download Document from Source Website

File Size: 129,02 KB

Share Document on Facebook

Similar Documents

Change of company name Under Part 4.5 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006. In making an application please refer to the Offshore Petroleum and Greenhouse Gas Storage ActTitle details Ti

DocID: 1vrW8 - View Document

Request for a variation of condition(s) of title—petroleum special prospecting authority or petroleum access authority Under part 2.11 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006. In making an applic

DocID: 1vqsh - View Document

Cash bid petroleum exploration permit: Cash bid form (prequalified applicants only) In accordance with Section 111 of the Offshore Petroleum and Greenhouse Gas Storage ActRelease Area Number (As published in the G

DocID: 1vq0j - View Document

ALABAMA LIQUEFIED PETROLEUM GAS BOARD P.O. Box 1742 TelephoneFax777 S. Lawrence St., Suite 100 Montgomery, AL

DocID: 1vpZ0 - View Document

ALABAMA LIQUEFIED PETROLEUM GAS BOARD P.O. Box 1742 TelephoneFax777 S. Lawrence St., Suite 100 Montgomery, AL

DocID: 1vpSP - View Document