<--- Back to Details
First PageDocument Content
Energy in Ukraine / Energy in the Soviet Union / Energy in Hungary / Oil pipelines / Nabucco pipeline / Russia in the European energy sector / Odessa–Brody pipeline / Baku–Tbilisi–Ceyhan pipeline / Druzhba pipeline / Energy / Europe / Energy in Turkey
Energy in Ukraine
Energy in the Soviet Union
Energy in Hungary
Oil pipelines
Nabucco pipeline
Russia in the European energy sector
Odessa–Brody pipeline
Baku–Tbilisi–Ceyhan pipeline
Druzhba pipeline
Energy
Europe
Energy in Turkey

Analysis of the Oil- and Gas-Pipeline-Links between EU and Russia

Add to Reading List

Source URL: mercury.ethz.ch

Download Document from Source Website

File Size: 626,59 KB

Share Document on Facebook

Similar Documents

Passive dosimetry in the PIRS module: J.K. Palfalvi1, J. Szabó1, V.A. Shurshakov2, R. Tolochek2, I. Ambrozova3, S. Kodaira4, T. Berger5, M. Hajek6 1 HAS, Centrre for Energy Research, Budapest, Hungary 2 RAS,

Passive dosimetry in the PIRS module: J.K. Palfalvi1, J. Szabó1, V.A. Shurshakov2, R. Tolochek2, I. Ambrozova3, S. Kodaira4, T. Berger5, M. Hajek6 1 HAS, Centrre for Energy Research, Budapest, Hungary 2 RAS,

DocID: 1jTvl - View Document

Employment Impacts of a Large-Scale Deep Building Energy Retrofit Programme in Hungary  Release date: June 8, 2010

Employment Impacts of a Large-Scale Deep Building Energy Retrofit Programme in Hungary Release date: June 8, 2010

DocID: 1euUw - View Document

Abstract Trend of spent fuel management and storage in Eastern Europe F. Takats, Hungary About 100 nuclear power plant units have been constructed in the Central and Eastern European (C+EE) countries, 71 are operational.

Abstract Trend of spent fuel management and storage in Eastern Europe F. Takats, Hungary About 100 nuclear power plant units have been constructed in the Central and Eastern European (C+EE) countries, 71 are operational.

DocID: 1aQUa - View Document

Press release  Thyssengas 2010 market test: striking demand for transmission capacity Regional planning procedure being prepared for 1.3 billion euro new natural gas pipeline

Press release Thyssengas 2010 market test: striking demand for transmission capacity Regional planning procedure being prepared for 1.3 billion euro new natural gas pipeline

DocID: 1awCu - View Document

Dominion Virginia Power 701 East Cary Srreer, Richmond, VAMailing Address: P.O. BoxRichmond, VAdom.com

Dominion Virginia Power 701 East Cary Srreer, Richmond, VAMailing Address: P.O. BoxRichmond, VAdom.com

DocID: 1akjS - View Document