Back to Results
First PageMeta Content
Ariane 5 / Guiana Space Centre / Ariane / Automated Transfer Vehicle / Albert Einstein ATV / Vega / Soyuz / Rocket launch / EADS Astrium Space Transportation / Spaceflight / European Space Agency / Space technology


A fourth launch for the International Space Station For its second Ariane 5 mission of the year, Arianespace will launch the fourth Automated Transfer Vehicle (ATV), dubbed “Albert Einstein”, for
Add to Reading List

Document Date: 2013-05-30 11:06:57


Open Document

File Size: 986,73 KB

Share Result on Facebook

City

Moscow / Kourou / Paris / Tokyo / Washington / D.C. / Columbus / Spaceport / /

Company

Astrium Mission / Arianespace / CNES / ATV / Ariane 5 / /

Continent

Europe / /

Country

French Guiana / Kazakhstan / Portugal / Singapore / /

Currency

EUR / /

/

Event

Company Expansion / /

Facility

Space Center / Payload Preparation Complex / Launcher Integration Building / Final Assembly Building / Space Station / International Space Station / S5 facility / Guiana Space Center / building S5C Electrical / /

IndustryTerm

prime contractor / launch site / command systems / propulsion systems / production prime contractor / guidance systems / payload processing buildings / food / energy / telecom network / satellite operators / satellite preparations / experimental hardware / launch systems / pressurized cargo carrier / electrical systems / propellant and fluid systems / /

NaturalFeature

Atlantic Ocean / /

Organization

French government / Space Center / European Space Agency / CNES / Guiana Space Center / EPC / Media Relations Office / ARIANESPACE mission / /

Person

Vega / Albert Einstein / ESA ESA ASTRIUM ASTRIUM ESA / Albert Einstein Appendix / ESA ASTRIUM ARIANESPACE / Astrid Emerit / /

/

Position

Range Operations Manager / Industrial prime contractor / Program Manager / Manager Range Operations Deputy / ATV Preparation Manager / Deputy Program Director / launch vehicle Launch Site Operations Manager Ariane Production Project Manager Launcher Production Quality Manager Launch Campaign Quality Manager / Preparation Manager / Head of Media Tel. / head / Manager In charge of / Director In charge of / Manager ESA ATV Preparation / Manager Launcher Production Quality Manager Launch Campaign Quality Manager In charge of / launch service contract Program Director / Deputy Director / Director / Prime contractor / production prime contractor / Deputy Manager / /

Product

Ariane / T-18 / T-30 / T-4 / T-0 / /

Region

South Pacific / /

Technology

broadband / GPS / ISP / /

URL

www.arianespace.com / /

SocialTag