Back to Results
First PageMeta Content



NOTES 1. * - BUILDER TO LOCALLY GRADE FINISHED LANDSCAPING TO ENTIRE PERIMETER OF BUILDING TO ENSURE ADEQUATE WATER RUN-OFF IS ACHIEVED. 2. * - ENSURE THAT ALL POINTS OF EGRESS FROM BUILDINGS ARE NO GREATER THAN 175mm(H)
Add to Reading List

Document Date: 2015-02-12 01:28:19


Open Document

File Size: 299,41 KB

Share Result on Facebook

City

Perth / /

/

Facility

KITCHEN STORE / /

/

Position

ARCHITECT / BUILDING SURVEYOR / CHAIR / STRUCTURAL ENGINEER / ENGINEER / CONSULTANTS CLIENT UPDATE AND CONSULTANT / CONSULTANT / /

Product

Olympus W-10 Voice Recorder / /

Technology

AV / /

URL

www.sitearchitecture.com.au / /