Back to Results
First PageMeta Content
Building engineering / Pile driver / Underwater acoustics / Deep foundation / Hydrophone / Engineering / Pile / Sensitivity / Egyptian Ratscrew / Geotechnical engineering / Construction / Sonar


Project Name UNDERWATER NOISE MONITORING PLAN
Add to Reading List

Document Date: 2014-08-01 21:56:22


Open Document

File Size: 318,26 KB

Share Result on Facebook

City

San Francisco / /

Company

Coastal / B.L. A.E. / Illingworth and Rodkin Inc. / Microsoft / /

Event

Person Communication and Meetings / /

Facility

National Institute of Standards and Technology / Root Mean Square / /

IndustryTerm

noise attenuation device / impact hammer energy rating / cumulative energy / acoustic energy / sound attenuation devices / energy plot / calibration equipment / hammer energy settings / steel chain / noisy equipment / sound attenuation device / strikes energy / proposed sound level monitoring equipment / real-time signal / sound monitoring equipment / stream bank / accumulated sound energy / data compression algorithms / energy / /

MusicGroup

Excel / /

NaturalFeature

Washington / Oregon / /

Organization

National Institute of Standards and Technology / Resources Division / NMFS Northwest Fisheries Science Center / Conservation Biology Division / Northwest Regional Office / /

Person

J.H. Miller / Max Min Mean Max Min Mean / Max Min Mean / /

Position

contractor / acoustics specialist / distant pile driver / calibrator / representative / CONTRACTOR REQUIREMENTS The contractor / pile driver / onsite inspector/contractor / /

Product

T-90 / /

ProvinceOrState

Oregon / Washington / /

Technology

Broadband / data compression algorithms / ESA / Laptop computer / PDF / /

URL

http /

SocialTag