<--- Back to Details
First PageDocument Content
Power station / Base load power plant / Peak demand / Electricity sector in India / Energy / Electric power distribution / Tamil Nadu Electricity Board
Date: 2012-09-19 08:25:56
Power station
Base load power plant
Peak demand
Electricity sector in India
Energy
Electric power distribution
Tamil Nadu Electricity Board

JBIC Ex-post Monitoring Report Project Name: India “Basin Bridge Gas Turbine Project” [Outline of Loan Agreement] Loan Amount/Loan Disbursed Amount Signing of Loan Agreement Final Disbursement Date

Add to Reading List

Source URL: www.jica.go.jp

Download Document from Source Website

File Size: 23,51 KB

Share Document on Facebook

Similar Documents

The Next Bigly Thing : Plastic-To-Oil by Robert A. Nelson Many experts warn that we are on the down side of the

The Next Bigly Thing : Plastic-To-Oil by Robert A. Nelson Many experts warn that we are on the down side of the "Peak Oil" Bell Curve of supply:demand -- but we clever hominids shall probe ever deeper with mighty microwa

DocID: 1xVPR - View Document

Online Learning For Demand Response Dileep Kalathil and Ram Rajagopal Abstract—Demand response is a key component of existing and future grid systems facing increased variability and peak demands. Scaling demand respon

Online Learning For Demand Response Dileep Kalathil and Ram Rajagopal Abstract—Demand response is a key component of existing and future grid systems facing increased variability and peak demands. Scaling demand respon

DocID: 1v2Ve - View Document

JULY 12, 2016  CHINA’S COAL MARKET: Did peak demand come and go? EIA Energy Conference: World Coal Markets

JULY 12, 2016 CHINA’S COAL MARKET: Did peak demand come and go? EIA Energy Conference: World Coal Markets

DocID: 1s0Gy - View Document

Utility SMARTswitch Conlog’s UTILITY SMARTswitch solution provides utilities with a simple, automatic mechanism to limit users’ load, especially over peak demand periods, without the need for load shedding. This ensu

Utility SMARTswitch Conlog’s UTILITY SMARTswitch solution provides utilities with a simple, automatic mechanism to limit users’ load, especially over peak demand periods, without the need for load shedding. This ensu

DocID: 1rUAR - View Document

Accommodation Supply & Demand during the Peak Winter Season on Mount Buller  This report is a summary of research conducted by Sunny Oliver-Bennetts as an Honours Project undertaken through the School of Sport, Tourism

Accommodation Supply & Demand during the Peak Winter Season on Mount Buller This report is a summary of research conducted by Sunny Oliver-Bennetts as an Honours Project undertaken through the School of Sport, Tourism

DocID: 1rLFx - View Document