<--- Back to Details
First PageDocument Content
Energy in the United States / North American Electric Reliability Corporation / ReliabilityFirst / Electric Reliability Council of Texas / Midwest Reliability Organization / Regional transmission organization / Energy Information Administration / Florida Reliability Coordinating Council / Eastern Interconnection / Economy of North America / Electric power
Date: 2010-12-02 07:34:33
Energy in the United States
North American Electric Reliability Corporation
ReliabilityFirst
Electric Reliability Council of Texas
Midwest Reliability Organization
Regional transmission organization
Energy Information Administration
Florida Reliability Coordinating Council
Eastern Interconnection
Economy of North America
Electric power

Form EIA-411 for 2009 Released: December 2010 Next Update: December 2011 Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, 2009 and Projected 2010 t

Add to Reading List

Source URL: www.eia.gov

Download Document from Source Website

File Size: 19,21 KB

Share Document on Facebook

Similar Documents

Automated Vulnerability Analysis of AC State Estimation under Constrained False Data Injection in Electric Power Systems Sicun Gao1 , Le Xie2 , Armando Solar-Lezama1 , Dimitrios Serpanos3 , and Howard Shrobe1 Abstract—

Automated Vulnerability Analysis of AC State Estimation under Constrained False Data Injection in Electric Power Systems Sicun Gao1 , Le Xie2 , Armando Solar-Lezama1 , Dimitrios Serpanos3 , and Howard Shrobe1 Abstract—

DocID: 1xU8c - View Document

March 20, 2018  Kyushu Electric Power Company Inc. Rejection of the Temporary Injunction against Restart of Genkai Nuclear Power Station Units No.3 and 4

March 20, 2018 Kyushu Electric Power Company Inc. Rejection of the Temporary Injunction against Restart of Genkai Nuclear Power Station Units No.3 and 4

DocID: 1vrhI - View Document

TRANSFORMER  Power Planar Magnetics and Hybrid Electric Vehicles The HEVs are here – and more are coming The electronic circuits in a hybrid electric vehicle must operate in an extreme temperature

TRANSFORMER Power Planar Magnetics and Hybrid Electric Vehicles The HEVs are here – and more are coming The electronic circuits in a hybrid electric vehicle must operate in an extreme temperature

DocID: 1vn7A - View Document

Where Does Our Electric Power Come From? Since November 1, 2014, the Kirkwood Meadows Public Utility District has purchased all of its power (except for emergency diesel generation) off of the Western power grid. Grid po

Where Does Our Electric Power Come From? Since November 1, 2014, the Kirkwood Meadows Public Utility District has purchased all of its power (except for emergency diesel generation) off of the Western power grid. Grid po

DocID: 1vip9 - View Document

profiles Modernization and refurbishment of San Miguel Electric Cooperative’s Rothemühle® regenerative heat exchanger results in a 3 MW savings in plant auxiliary power. Recent upgrades to the Rothemühle regenerativ

profiles Modernization and refurbishment of San Miguel Electric Cooperative’s Rothemühle® regenerative heat exchanger results in a 3 MW savings in plant auxiliary power. Recent upgrades to the Rothemühle regenerativ

DocID: 1v7GL - View Document