Back to Results
First PageMeta Content
Microgeneration / Sustainable energy / Wind turbines / Energy / Distributed generation / Energy policy


Microgeneration Installation Standard: MISREQUIREMENTS FOR CONTRACTORS UNDERTAKING THE SUPPLY, DESIGN, INSTALLATION, SET TO WORK COMMISSIONING AND HANDOVER OF MICRO
Add to Reading List

Document Date: 2013-12-16 12:12:43


Open Document

File Size: 1,42 MB

Share Result on Facebook

City

London / /

Company

Steering Group / MCS Steering Group / Energy Saving Trust / Small Wind Turbine Systems / Microgeneration Certification Scheme Working Group / /

Country

United Kingdom / Northern Ireland / Scotland / Wales / /

/

Facility

Trading Standards Institute / /

IndustryTerm

wind-powered electricity generating systems / supplementary energy generation source / wind turbine systems / electricity / certificated contractor / annual energy production / off-grid battery charging systems / build site / electricity distribution / periodic audits / energy / /

Movie

D. 4 / D. 3 / D. 2 / /

Organization

office of Fair Trading / Trading Standards Institute / Department of Energy / Climate Change / /

Position

contractor / THE CERTIFICATED CONTRACTOR / DEFINITIONS Contractor / certificated contractor / Secretary / /

URL

www.microgenerationcertification.org / /

SocialTag